PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing bathroom carriers at the 4th floor Facing West.jpg Installing black duct work at the 4th floor Facing East.jpg Installing copper piping at the 2nd floor Facing East.jpg Installing Sprinkler Main Raiser at Stair -2 Facing East 1.jpg Installing Sprinkler Main Raiser at Stair -2 Facing East 2.jpg
Previous page Installing Sprinkler Main Raiser at Stair -2 Facing East 2
Installing Sprinkler Main Raiser at Stair -2 Facing East 2